Insights
Insights and field notes.
Plain-language explainers, analysis and field notes on batteries, grid programs, and compute sites.
Explainers
Energy Router
Energy Router vs. gateway
An Energy Router coordinates solar, batteries and other equipment as one system. A gateway moves data between systems. See how the two differ.
Energy Router vs. BEMS
A building energy management system runs building systems. An Energy Router coordinates the solar, batteries and other equipment at your site.
Energy Router vs. microgrid controller
A microgrid controller runs a microgrid. An Energy Router coordinates the equipment at a home or small site within each device's limits. See the roles.
Energy Router vs. DERMS
A DERMS plans actions across many resources. An Energy Router carries out control on site for the equipment it supports. See how the two layers relate.
Where the Energy Router fits in the energy software stack
Distributed energy software works at several layers. This page names each layer by what it does and shows how the Energy Router relates to it.
Monitoring solar and batteries from many manufacturers
Read solar and batteries from different manufacturers in one dashboard. See what has to be standardized and how an Energy Router collects the readings.
DERMS and virtual power plants
What are DERMS?
A DERMS is software that manages distributed energy resources such as solar, batteries and EV chargers. See what a DERMS does and where Elastic fits.
DERMS vs. VPP
A DERMS is the software that manages distributed energy resources. A VPP is an aggregation of resources operated together. See how DERMS and VPP relate.
What is a virtual power plant?
A virtual power plant coordinates solar, batteries and EVs as one portfolio that can respond to grid programs. See how a VPP works and where Elastic fits.
What is a virtual power purchase agreement?
A virtual power purchase agreement is a financial contract for differences against wholesale power prices. See how it differs from a physical PPA.
What is DER orchestration?
DER flexibility is the coordination of distributed solar and batteries within the limits of each site's equipment. This page explains the term and how Elastic uses it.
Building a VPP with batteries from many manufacturers
See how a virtual power plant combines batteries from different manufacturers, and where device compatibility sets the limit on what the group can deliver.
Why battery location matters for VPP and data center dispatch
Two equal batteries can help a grid differently, at a VPP or a data center. See how feeders, transformers and phases set a dispatch's value.
Can I join a virtual power plant with a battery I already own?
Your utility or battery maker runs the program and you enroll through one of them. See who decides eligibility, how to enroll and where Elastic fits.
Battery and demand response programs
Battery and demand response programs from Eversource, Con Edison, SDG&E, SCE and FortisBC, with season, event hours and enrollment. As of October 2026.
Virtual power plant vs. demand response vs. capacity program
A virtual power plant is a group of resources, demand response is a change in use, and a capacity program pays for readiness. See how the three fit.
BC Hydro Peak Saver: Devices and Rewards
BC Hydro Peak Saver pays bill credits when thermostats, batteries, EV chargers and more cut demand in winter peak events. See devices and how to enroll.
BC Hydro Battery Rebate: Amounts and Caps
The BC Hydro battery rebate pays per kWh of storage, with a higher cap when you join Peak Saver. See the amounts, eligibility rules and installer rule.
Dispatch and data
How DER dispatch is validated
Dispatch validation compares what was requested with what the equipment did, using measured telemetry and a record of each command and response.
What telemetry does device control need?
Useful control starts with readings you can interpret: power, state of charge, availability and grid signals. See what an Energy Router reads.
How opt-outs and device availability work
Owners choose whether their equipment takes part. See how opt-outs and device availability decide which equipment can respond to a grid event.
What is dispatchable revenue?
Dispatchable revenue is income that may be earned by making equipment available to respond to a grid or program instruction. See what affects it.
Proving a virtual power plant delivered what it promised
A virtual power plant's rated power is not its delivered power. Work through a 200-battery example and see what the gap means for a buyer and an operator.
IEEE 2030.5, SunSpec and Modbus: what each one does
IEEE 2030.5 carries grid instructions, Modbus moves device data and SunSpec standardizes it. See what each does and where a site controller fits.
How we work
Our approach to coordinating energy equipment
How Elastic plans for a site's equipment, internet connection and owner's needs, and designs for five conditions, such as an internet outage.
What is Elastic Energy?
Elastic Energy is an energy company in Victoria, BC that builds the Energy Router, which connects and runs home and site equipment as one system.
Compute sites
Connecting a large load in BC
What BC Hydro's 2026 Call for Demand asks of a data center project, what selection secures, and where a site's own equipment fits in its connection terms.
Where control sits on a compute site
What the Energy Router connects to on a data center site, how it schedules on-site energy equipment, and what stays under the site's own operation.
Cutting peak demand at a compute site
How BC Hydro rate schedules set a data center's demand charge, what limits on-site equipment's effect on a billing peak, and how it is scheduled.
Can a data center connect faster by making its demand flexible?
A data center that can cut demand in a few constrained hours can connect on different terms. See what US research shows and where on-site equipment fits.
Six ways a data center can pair power and capacity with the grid
Six ways to pair data center power with the grid, including funding nearby homes and businesses to flex. What the utility decides and where Elastic fits.
Articles
Field notes
Elastic Fieldwork 002, San Francisco
A second night in the Outer Richmond, with arcing seen on more poles along the same overhead run.
Elastic Fieldwork 001, San Francisco
A five-hour live stream from the Outer Richmond, watching an intermittent glow at a utility pole.
Ben on MTS: grid capacity
Ben Hilborn joins the MTS live show to talk about grid capacity and local power.
Ben on Uncapped Notes
Ben Hilborn sits down with Hustle Fund's Haley Bryant for a live episode on building Elastic Energy.
Future in Review 2026 panel
Ben Hilborn joins a Future in Review panel on power demand and the energy economy.
Battery Innovation Summit panel
Ben Hilborn on a distributed energy and virtual power plant panel at the Battery Innovation Summit.
Healthy Homes Fair 2026
We had a booth at the 2026 fair, talking with DC homeowners about home electrification.
DERVOS 2025 field notes
We took the Energy Router to program operators on Governors Island and built a lounge for real conversations about deployments.
RE+ 2025 field notes
Our first booth and first public demo, in Las Vegas. What we showed and what we heard.
Ben on the Climate Tech Startups Podcast
An early conversation with Ben Hilborn on Currents' Climate Tech Startups Podcast.