Data centers need firm power faster than the grid can build it.
For data centers
Elastic helps you plan, build and optimize the energy behind your site, and unlocks flexible capacity nearby.
Data centers need firm power faster than the grid can build it.
In some regions, grid operators are setting conditions on new large loads that want to connect.
A data center that wants to connect sooner can fund flexibility, in its own batteries and in nearby homes and businesses.
Can a data center connect faster by making its demand flexible?
Six ways to pair a data center's power with the grid.
What BC Hydro's 2026 Call for Demand asks of a data center project, and where a site battery fits.
Flexibility means shifting when a site draws or supplies power, so the grid has room for more load. Your utility decides whether it counts toward a connection, and how much.
Your compute and cooling stay under your own control systems, and Elastic works alongside your hardware and engineering partners.
Where a program exists and the data center funds it, those that take part can be paid for the flexibility they already hold.
One conversation covers your workload, power system, meter data and connection conditions.