Start a pilot
Energy Router pilots on live sites
Field evidence before a wider deployment.
Two choices shape a pilot.
- One market.
Pick the market you deploy in.
- A defined density.
Set site count and density to fit your portfolio and the evidence you need.
Find the issues
while the scope
is still small.
A mislabeled breaker. A meter with a different CT ratio. A firmware version that behaves differently. A pilot surfaces each one, then logs, fixes, and retests it.

What a pilot checks
Each check has a question and a record.
01The platform sees the equipment in scope.
Discover the intended equipment and confirm its readings arrive. Resolve the gaps before treating the site as ready.
Evidence: the device inventory set in the pilot scope and the observed telemetry, with discovery or reading issues recorded.
02Command delivery and response.
Run the planned control events and compare each instruction with what the equipment did and the measured result.
Evidence: command-to-outcome records for the planned tests, with exceptions investigated and retested.
03The system holds up in the field.
Evaluate operation under real site conditions. Track the changes and follow-up tests that shape a deployment decision.
Evidence: a field record of operation and issues against the success criteria set for the pilot.
Use the same platform you would roll out.
Inspect equipment and follow each dispatch record during the pilot.
Come with your portfolio. We’ll scope the work.
Bring the market, intended sites, equipment models, and the problem you want to validate. We set success criteria and commercial terms with you before the evaluation starts.
We connect the Energy Router to your equipment and test discovery, telemetry, and control against those criteria.