Rated, dispatched and delivered power

Three numbers describe one event. Rated power is the sum of the battery ratings. Dispatched power is what the operator asked for. Delivered power is what was measured. A successful command does not show that a battery discharged, so only the third number is evidence of delivery.

For illustration, 1,000 kW dispatched falls to 772 kW delivered after offline batteries, owner reserve and equipment limits.

The 200 x 5 kW example

For illustration, a portfolio holds 200 batteries rated at 5 kW each. Rated power is 1,000 kW, or 1 MW. The operator dispatches all of it. The table shows how an event can end with less.

One event, for illustration
StepBatteries affectedPower changeRunning total
Rated power2001,000 kW
Offline during the event1470 kW less930 kW
At or below the owner's reserve22110 kW less820 kW
Limited to 3 kW by the equipment2448 kW less772 kW
Delivered772 kW

The portfolio delivered 772 kW against 1,000 kW dispatched. The shortfall is 228 kW, or 23 percent. Battery output is also only part of the picture at a customer's meter, because the home's own use and solar change at the same time. A battery discharging 5 kW to a home that adds a 3 kW load shows a 2 kW change at the meter.

What the gap means for a buyer

A buyer who counted on 1,000 kW holds 772 kW. The contract or program sets what follows. Payment can scale with delivered power, a shortfall can carry a penalty, and the next commitment can be set lower. In every case the buyer needs the delivered number, event by event, to plan the next commitment on what the portfolio did and not on what the ratings say.

Which meter counts

A program that pays on settled power names its own metering, baseline and rules. Those decide the figure that is paid. What is dispatchable revenue? covers what moves that figure.

Planning a commitment from delivered history

Delivered power from past events is the guide to the next commitment. A portfolio that delivered 772 kW of 1,000 kW in one event can count the three causes in the table over several events. It can then commit what it has reliably delivered. What telemetry does device control need? lists the readings that make those counts possible.