Why it matters
Each device does its job.
Solar and batteries follow the site's needs.
Limits are respected.
Equipment limits and owner choices set what a dispatch can ask for.
The result is on record.
Each command keeps its response, so you can see what the device did.
One job, two names
Distributed energy resources, or DERs, are the solar, batteries and flexible loads at homes and sites.
Program documents say DER orchestration. Elastic says flexibility.
What DER orchestration involves
It starts from the facts of the site: the equipment, the connection conditions and the owner's needs.
Then it runs in four steps, and each one leaves something to check afterward.
- Connect: read the equipment.
- Decide: set the intended action and the limits.
- Act: send the instruction.
- Record: keep the response and the outcome.
Why the site layer matters
A program plans across many sites. Each instruction still needs an equipment interface and a command that works at the site. The Energy Router works there.
Define each step to avoid gaps between a plan and a device. Decide who can send commands, and what record confirms the response.
How it fits with the equipment you have
DER orchestration starts from what is already installed. The Energy Router connects through the interfaces the equipment already has: Modbus RTU, Modbus TCP, Wi-Fi, Matter, local APIs and local MQTT.
Solar inverters and batteries often use different interfaces. A driver is the software that lets the Energy Router talk to one family of equipment, such as one maker's inverters. Supported equipment is on the compatibility list. Confirm your exact model and we will tell you the control level.
Homeowners open the app and see what their system did.
Where the Energy Router fits
The Energy Router keeps operating on site without an internet connection. New commands from the platform reach it once the connection returns.
It works at the site layer. A DERMS plans across many resources. The Energy Router carries out the local instructions its driver supports, and keeps the commands and responses.
Dispatch and proof
Real-time dispatch is the instruction that asks equipment on site to act, such as charging a battery during a set window. Validation compares what was requested with what the equipment did. Acceptance and measured outcome are separate parts of the record. Tolerance is the allowed gap between request and result. Record the exception, investigate the cause and repeat the test after a correction.
A dispatch event runs from request to outcome. Record the requested action and time window, check that the device accepted the instruction, then observe the metered response, meaning the power measured at the meter. Compare the response with the defined test or baseline, and record the outcome.
A baseline is the reference case that a result is compared with, such as usual energy use before the event. Its method depends on the program or test.
A correct number can still answer the wrong question. Align the event window with the measurement timestamps, then confirm the units, the direction of flow and where the meter sits.
Evidence of what a device did is not proof of what is payable. Settlement is the program's process for deciding payment.
Owner choices
Each owner opts in, one authorization at a time, so a program dispatches to sites that have said yes. The pages on owner opt-outs and telemetry requirements cover what a program must respect and what a site must report.
Who uses it
- Utilities and aggregators reach the equipment at each site through one point of control across manufacturers, then plan on their own platform. Sites are ready for a program without a custom integration per site. Scope a pilot around your program, region and equipment mix.
- Installers see and support every connected site from one dashboard.
- Equipment manufacturers write a driver once with Elastic and test each model on real hardware.
- Large sites such as data centers have the Energy Router schedule the battery and record the result.
DER orchestration, DERMS and virtual power plants
A DERMS is software that manages distributed energy resources, one at a time or together. A virtual power plant is a group of resources operated together. Both still need each instruction carried out at the site.
See the DERMS guide and the DERMS and VPP comparison for the detail.
Try it on your own sites
A pilot shows what the equipment does at your sites. We test discovery, telemetry and control, then review the results with you. Set the success criteria, the measurements and the review process before testing.
Ask your assistant.