Who decides whether equipment takes part
Owners decide whether their equipment takes part, within the terms of any program you join. A program is an arrangement, often run by a utility, that sets the terms for flexible response, including any payment. The owner's permissions and the program's terms set the rules. An opt-out is the owner's choice not to take part, and the program's terms say how and when it applies.
Why availability changes
Availability changes with conditions. A battery can be holding charge in reserve, a device can have a fault, a site can have limits, or the connection can be down. A useful availability record shows each of these conditions.
Installed and available capacity
Two numbers keep you from counting the same equipment twice. Installed capacity is the most power the equipment is rated to deliver. Available capacity is the part that can respond under current conditions, and a program can add its own eligibility rules.
What the record shows
Every dispatch carries a record of the command, the acknowledgement, and the outcome. Read with the owner's permissions and the site's limits, that record helps explain a response or an exception.
Common questions.
Does sharing data authorize control?
Data access and control authority are separate.
What happens when the site loses its internet connection?
The Energy Router keeps operating on site without an internet connection. New commands from the platform reach it once the connection returns.